Concrete pool renovations, Bundaberg

This week we’ve been working on a Pool renovation where the pool was around 15-20 years old. Still very solid, just a little tired and dated. The client had the option of Pebble or Quatrzon interior and after some deliberation choose 2-3 mm pebble in Champagne which give a soft turquoise water appearance.

 

In preparing the pool for its new finish the existing coping papers were removed and relevelled which some slight imperfections required removing. Same for the tile band which was removed completely then squared up and a new tile band was installed prior to finishing the coping tile. This tile match the pool surrounds and had the front edge nosed to soften the look and feel. Using vitreous tiles makes this possible as the biscuit of the tile is the same from top to bottom of the tile.

The interior required jack hammering under the waterline to allow a smooth transition up the wall, then all other areas required to be sparrow pecked to give a good bond to the entire finish. Then the floor was sanded and pressure cleaning before applying a bonding coat prior to the final pool finish.

Day has come and the pool interior is to be applied.. quick slurry over the base and pebble is applied just like new… then the pool is filled, water tested and its all complete.. looks far more like a modern new pool… pics of finished pool still to come as its still filling as we speak.. keep and eye out for that.

by Peter Moller.. Lifestyle solutions centre, 78 Mt Perry Road North Bundaberg.. http//:www.lifestylesolutions.com.au